The Villages at Southbranch, Phase 4A
Sipsey Way east of Bankhead Drive
Preliminary plat for 49 single-family lots and one common open space on about 14.24 acres.
PUBLIC MAP RECORDS
Browse official agenda records alongside approved community reports. Community reports remain clearly labeled unless an administrator has verified them.
38 public records.
Sipsey Way east of Bankhead Drive
Preliminary plat for 49 single-family lots and one common open space on about 14.24 acres.
Craft Road
City roadway-widening project with a contract change order for unsuitable subgrade conditions.
Olive Branch
Design and construction-engineering services proposed for a conservatory and recreational area.
4128 Farguson Cove
Variance request for construction of a 20-by-20-foot accessory building.
Olive Branch
Municipal fire-station project with engineering and construction contract changes.
Craft Road
Raw-water production facility project with bids considered by the Board.
Municipal Soccer Complex
Shared-use path project with an engineering contract amendment.
8211 Industrial Drive
Revision combining Lots 12 and 13 into a new 1.38-acre Lot 12A.
Terminal Drive
Utility-corridor project with a contract scope change.
4529 Pleasant Hill Road
Final plat for three detached single-family residential lots totaling about 4.95 acres.
Stateline Road
City and county project for overlay and roadway improvements.
Jericho Way and James Herbert Drive
Replat of Lots 9 and 10 into two commercial parcels.